TECWIND 5.6 with Gin Pole Tower Lift
Arrowedge Foundation System
The Arrowedge Foundation System is a patented and fully engineered system that elimintes the need for concrete. This also allows for the installation of the foundation one day and the installation of the wind system the next day saving you time and money and will allow you to start generating power at least one month sooner than conventional concrete foundations.
All this with less of an environmental impact on your property. The system needs no excavation and has no overburben of extra soil to dispose of. In addition to the rapid deployment of your wind system the landscape surrounding the installlation will not be adversely affected.
The design will accomodate all soil types including sandy and clay soils.
Arrowedge Foundation Installation
Hydralift-Hydraulic Tower Lifting System
Now you can raise and lower your wind turbine to check on the wind system anytime you need to. It's as easy as connecting a cyliner to the tower base, turn on a hydraulic pump and you can safely and easily lower and then raise your tower. Check with your dealer for monopole tower sizes and system power options.
|